Kedzie Avenue Bridge reconstruction begins - FOX 32 News Chicago

Kedzie Avenue Bridge reconstruction begins

Posted: Updated:
CHICAGO (Sun-Times Media Wire) -

Reconstruction work began on the Kedzie Avenue Bridge over the Chicago Sanitary & Ship Canal on the Southwest Side Tuesday.

According to the Chicago Dept. of Transportation, the three-span fixed bridge was first built in 1909 and reconstructed in 1969.

The bridge will be completely restored with a new concrete roadway deck; repaired girders, floor beams and lateral bracing; and new sidewalks with fiberglass panels, a statement from CDOT said.

The $5 million project is expected to create about 50 jobs, CDOT said, and is being funded through the Illinois Dept. of Transportation.

Construction will be performed in two phases, which will keep one vehicle lane open in each direction from March 5 until May 28. From that point until November, the roadway will be completely closed while the deck is replaced and supports are repaired. One sidewalk will remain open throughout construction.

During construction, truck traffic will be detoured to the canal bridge on Pulaski Road. All other vehicles, including cars, buses and bicycles, will be detoured to cross the canal at California Avenue.

Share Your Photos & Video

Powered by WorldNow

205 N. Michigan Avenue
Ground Floor
Chicago, IL 60601
Station Operator: (312) 565-5532
Newsroom: (312)565-5533

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices